Engineering & Construction​

Engineering

RAPID PENGERANG

This project includes the fabrication and installation of steel structures and roofing for the chemical injection shelter, and steam turbine shelter, as well as fabricating and installing steel structures, platforms, stairs, and steps for pipe bridges. As a main contractor, KPRJ E & C Sdn Bhd has provided all the necessary materials, equipment, and manpower to complete this task.

Owner
: PRPC UTILITIES AND FACILITIES SDN BHD
Main Contractor
: MIE INDUSTRIAL SDN BHD
Project Start
: 15th AUGUST 2019
Project Finish
: 3rd MARCH 2020
Contract
: RM 1,591,000.00
Project Location
: RAPID PENGERANG

Scope of Works

  1. Chemical Injection Shelter (Fabricate and installation of steel structure and Roofing)
  2. Steam Turbine Shelter (Fabricate and installation of steel structure and Roofing, platform, stairs and step)
  3. Pipe Bridge, Pipe Support, Operating Platform & Cross Over (Fabricate and installation of steel structure, platform, stairs and steps, cross over)

Core Business

Entertainment Theme Park

Core Business

Catalytic Project